Heavy-duty buildings built around the process inside them.

We build manufacturing and process facilities where the structure, floor, and services are dictated by the plant they house — engineered for heavy loads, continuous operation, and future change.

Overview

Inside-Out
Design

Industrial buildings are designed from the inside out. Before a structural grid is drawn, we map the process: crane runway levels, machine base loads, process pipe routes, overhead services, and future expansion bays. The building envelope, column grid, and floor specification follow from those constraints — not the other way around. This means the facility works as hard as the equipment it houses, from the first day of production.

Heavy-duty slabs, crane beams, and mezzanine structures are engineered to the specific loads of the installed plant, with machine bases isolated where vibration is a concern. Process services — compressed air, process gases, high-voltage power, and specialist drainage — are routed and terminated in coordination with the production line layout, eliminating costly retrofits after practical completion.

What We Deliver

Our Capabilities

01

Long-Span Structure

Steel portal and braced frames designed for cranes, mezzanines, and heavy suspended services — clear spans that keep the production floor unobstructed.

02

Heavy-Duty Slabs

Floor slabs engineered for point loads, machine bases, and abrasion in continuous use — FM2 super-flat tolerance where precision processes demand it.

03

Process Integration

Mechanical, electrical, and process services coordinated to the production line layout — no clashes, no retrofits, no programme delays.

04

Logistics & Access

Loading, circulation, and yard design that keeps material, vehicles, and people moving safely — HGV swept paths, dock levellers, and gatehouse infrastructure.

Technical Specifications

Engineered For Heavy Industry

100T+

Crane Loads Designed For

FM2

Super-Flat Floor Tolerance

30m+

Clear Span Steel Portal Frames

24/7

Continuous Operation Engineered In