
ConstructionFinishing WorksHandover Documentation
Handover Documentation
Everything, documented.
O&M manuals, as-built records, and health-and-safety files compiled into a clear, complete handover package.
Overview
What We
Deliver
Handover Documentation is where a project is judged. The structure may be sound and the services installed, but it is the finish, the testing, and the handover that a client remembers. We approach handover documentation methodically — inspecting, correcting, and documenting so nothing is left outstanding at completion.
Our teams work through defined checks, coordinate with commissioning and building control, and assemble the certificates and records that prove the building performs as designed. The result is handover documentation, closing out the programme cleanly and leaving the client fully informed.
Capabilities
What We Deliver
Inspection & Snagging
Systematic inspection and snagging so handover documentation meets specification before the building is signed off.
Testing & Commissioning
Handover Documentation verified through testing and commissioning, with results recorded against the design intent.
Certification
Certificates and compliance records for handover documentation assembled to satisfy building control and warranty providers.
Handover Pack
As-built information and O&M documentation for handover documentation compiled into a clear, complete handover pack.
Process
From Site To
Handover
Inspection
Systematic inspection against specification and drawings, logging every item that needs attention before completion.
Snagging
Defects and snags corrected and re-inspected until the works meet the agreed quality standard.
Testing & Certification
Systems tested, commissioned, and certified, with results recorded against design criteria.
Handover
O&M manuals, certificates, and as-built records compiled and handed over for a clean, informed completion.
Finishing Works
Planning Your
Handover Documentation Project?
From final checks to a fully documented handover, our team will close out your handover documentation to a standard that satisfies both client and building control.
Start A Conversation