Ground Stabilisation
Weak ground, made buildable.
Ground improvement and stabilisation techniques that turn poor ground into reliable bearing for construction.
Overview
What We
Deliver
Ground Stabilisation determines whether everything above it succeeds. Ground conditions in the UK vary enormously, so ground stabilisation must be founded on proper investigation and designed to Eurocode 7 (BS EN 1997) with the right factors of safety. We combine geotechnical understanding with plant and method to deliver ground stabilisation engineered to carry the loads above it reliably.
Our teams work under CDM 2015 with careful attention to excavation safety, temporary works, and buried services. From dig to backfill, we deliver ground stabilisation — set out accurately, constructed correctly, and ready for the structure to follow.
Capabilities
What We Deliver
Ground Investigation
Site and ground investigation informing the ground stabilisation design with real data on soils, water, and bearing capacity.
Design to Eurocode 7
Ground Stabilisation designed to BS EN 1997 with appropriate ground models, safety factors, and temporary works.
Safe Construction
Ground Stabilisation constructed under CDM 2015 with excavation support, services avoidance, and accurate setting out.
Verification & Backfill
Inspection, testing, and controlled backfill verifying ground stabilisation against the design before the structure follows.
Standards
Ground Engineering
Standards
BS EN 1997
Eurocode 7
Geotechnical design to Eurocode 7 with appropriate ground models and partial safety factors.
BS 8004
Foundations
Foundation design and construction to the code of practice for foundations.
CDM 2015
Safety
Excavation, temporary works, and services managed under the Construction (Design and Management) Regulations.
SuDS
Drainage
Sustainable drainage systems designed to the CIRIA SuDS Manual and local authority requirements.
Groundworks
Planning Your
Ground Stabilisation Project?
From ground investigation to construction, our team will design and deliver your ground stabilisation to Eurocode 7 — safely, accurately, and ready to build on.
Start A Conversation